Sampling
Sample development
The sample is the point where your product stops being an idea and becomes a specification. Nothing goes into bulk production before you have approved one.
The sampling process
Design review
We review your reference images, sketches, sample or tech pack, and confirm exactly what is being developed — including anything still undecided.
Fabric selection
We propose fabrics by composition, weight and hand feel, and confirm availability before proceeding.
Pattern development
A pattern is developed to your measurements and intended fit, or from a physical sample you send us.
Sample development
The sample is cut and sewn in the selected fabric, with the intended construction.
Client review
You receive the sample and send specific feedback. Measurements are far more useful to us than general impressions.
Revisions
Requested changes are applied. Depending on how much changes, a second sample may be produced.
Approval
Once approved, the sample and its measurement chart become the written reference for bulk production.
Sample lead time is confirmed after reviewing the design and production requirements.
What affects the timeline
There is no single fixed sampling time that applies to every product. These are the factors that actually move it:
Fabric availability
A fabric held locally is much faster than one that has to be sourced or imported.
Product complexity
A plain T-shirt and a lined dress are not comparable in development time.
Trims and finishing
Custom labels, drawcords, zips and packaging have their own lead times.
Revisions
Each round of changes adds time. Consolidated feedback is faster than several separate messages.
Sample costs
Sample pricing is project-specific
Sample pricing is confirmed after reviewing the design and production requirements.
The cost depends on the product
A jersey T-shirt and a lined dress in imported fabric are not the same cost. We quote the sample for your specific product rather than publishing a single price.
Shipping is quoted separately
Courier cost to your country is quoted separately where applicable.
Production price comes after
The final production price is confirmed after the product has been reviewed and the sample developed, when the actual fabric consumption and construction are known.